120㎡三室两厅,空调新风净水配置与预算
Optimizing Comfort in Your 120㎡ Tianjin Apartment Optimizing Comfort in Your 120㎡ Tianjin Apartment
In Tianjin, a 120㎡ three-bedroom two-bathroom apartment is the most common choice for families transitioning to a new home or for multi-generational households. When you receive the keys to your new home, everyone wants to make it comfortable – cool in the summer, fresh air even with the windows closed, and clean, soft water from the tap. However, when it comes to budgeting for renovation, the cost can be tight. How do you choose the right air conditioning, ventilation, and water purification systems without overspending and leaving regrets?
Based on the extensive surveying and delivery experience of Quanji Comfort Home (Tianjin Quanji Comfort Home Technology Co., Ltd.) in Tianjin, here are three practical principles to keep in mind when equipping a 120㎡ three-bedroom two-bathroom apartment with a comfortable home environment:
Number of central air conditioning indoor units should be determined by the rooms, and the horsepower should be calculated based on the load of each room. The air volume of central ventilation should be calculated based on the number of residents and the actual floor area. It is best to have the drawings for air conditioning, ventilation, and whole-house water purification done at the same time as the electrical and water renovation. This saves space and avoids conflicts on site.If your budget is limited, there is a hard truth that can help many families save a lot of detours: prioritize the completion of concealed engineering such as ceiling and wall埋管, and put the end devices that can be added at any time later.
Why Can't You Directly Use the "One-to-Four" Template for a 120㎡ Three-Bedroom Two-Bathroom Apartment?
Many homeowners ask when they enter the store, "My apartment is 120 square meters, is it enough to install a one-to-four, 5 horsepower outdoor unit?" In practice, 120㎡ usually uses a one-to-four (one for the living room and one for each bedroom), but if the dining room is independent and spacious, there may also be a one-to-five configuration. As for whether to choose a 5 horsepower or 6 horsepower outdoor unit, it is not based on the building area, but on the calculation of the thermal conditions of each room.
In the design process of Quanji Comfort Home, engineers will focus on the following four factors that directly affect the sense of comfort (the specific model needs to be determined after on-site measurement):
1. Orientation and window-to-wall ratio: The heat energy difference between a 15㎡ bedroom with a north-facing ordinary bay window and a south-facing or west-facing room with a large floor-to-ceiling window can be 20% to 35% in the hot afternoon of summer in Tianjin. If the room is not adjusted by one level of cooling capacity for the west-facing room, it may take half an hour to cool down when you come home in the evening. 2. Floor position: Living in the middle floor, with neighbors above and below to help insulate, the heat and cold loss is small; but if it is the top floor (the roof heat transfer is fast) or the first floor (the ground floor is a garage or an open space), the cold and hot are more obvious in winter and summer, and the required amount of heat and cold in the same area is naturally higher. 3. Space transparency: Many 120㎡户型 like to do a guest and dining room integration, and even make the kitchen open. The space is bright, and the cold air will also spread along the corridor and kitchen, so the horsepower of the indoor unit in the living room needs to be calculated according to the merged area after connection, otherwise the dining room will be obviously stuffy when cooking. 4. Net height: The indoor air volume is different for houses with an original height of 2.8 meters and above, and the amount of refrigeration needed to reach the set temperature will also increase accordingly.How to choose the amount of new air? According to national standards and considering the quietness of the sleeping experience at night, it is usually calculated simultaneously: one account is "per capita new air volume (30-50m³/h·person) × number of residents", and the other account is "floor area of the apartment × height × air exchange times (about 0.8-1 times per hour)", and take the larger of the two. Taking a three-person family living in a 120㎡ (actual apartment new air coverage area about 85-95㎡, net height 2.7m) as an example, the calculation based on the number of people is about 150m³/h, and the calculation based on space air exchange is about 230-260m³/h, so the main unit air volume in the range of 250m³/h – 350m³/h is the most comfortable – it can ensure that the air in the whole house is always fresh, and the low-speed operation at night is almost inaudible.
How to Spend Your Budget Wisely? Three-tier Configuration Strategy
The worst thing about home renovation is "wanting everything and buying the cheapest for each item", resulting in a poor experience. From the perspective of whether the construction can be regretted, the central air conditioning indoor units and copper pipes, and the central ventilation main unit and air ducts are all hidden in the ceiling, once the ceiling is sealed and painted, it is almost impossible to do non-destructive work; while the countertop water purifier, pipeline machine and other terminal equipment, as long as the power and pipeline are left ready during the water and electricity stage, it can be bought later even after living for a year.
According to the priority of "concealed first, then visible", the budget for comfortable home equipment in a 120㎡ three-bedroom two-bathroom apartment can be naturally divided into three levels to promote:
First tier · Basic set (priority to ensure central air conditioning): If the current budget is tight, first lay the foundation for the most urgent summer cooling and heating in the transition season. Select the outdoor unit horsepower and indoor units for each room according to the load, and focus the budget on the silent performance, temperature control accuracy, and ultra-thin indoor units of the living room and master bedroom, so as to get rid of the trouble of occupying the wall with hanging machines and uncomfortable direct blowing. Second tier · Advanced set (central air conditioning + central ventilation): For families with the elderly, babies, or those who are sensitive to smog, dust, and stuffiness when closed windows, it is strongly recommended to install central ventilation all at once during the ceiling stage. The air conditioning and ventilation are done at the same time as the ceiling deepening, and the full heat exchange new ventilation unit is matched with a smooth air duct path, which can not only ventilate and change air without opening the window, but also reduce the loss of indoor cold and heat. Third tier · Full set (central air conditioning + central ventilation + whole-house water purification): If you want to complete the new home in one step and there is enough installation space in the kitchen or equipment room, you can connect the pre-filter, central water purification, central soft water, and terminal drinking water road during the water and electricity stage, and realize the quality treatment of water for washing and bathing and drinking water. The three systems are delivered by the same team, which is the most worry-free.How to Coordinate the Construction Schedule When Installing Three Systems at the Same Time?
Many homeowners have suffered from the loss of "finding three stores separately": the air conditioning company first occupies the best position under the beam, and when the ventilation company comes in, there is no place to go, and the air duct is only pressed down, resulting in the ceiling of the living room being compressed by a large amount; or the water purifier and the cabinet, and the drain pipe are squeezed together, and it is difficult to change the filter core later.
In Quanji Comfort Home, the technical team coordinates the interfaces and deliveries of air conditioning, ventilation, and water purification, and the site will advance in parallel according to two clear timelines:
Air conditioning and ventilation – out of the drawing before electrical and water renovation, enter the site at the same time as electrical and water renovation: The designer draws the location of the air conditioning indoor unit, the position of the ventilation main unit, and the penetration scheme of the beam on the same ceiling comprehensive drawing, the pipeline is layered, and the beam is coordinated to keep the original ceiling height of the living room and corridor as much as possible for the family. Whole-house water purification – follow the water and electricity construction node, and do not interfere with ceiling construction: When the water and electricity is opened, the engineer checks the location of the入户 main water valve, the drainage conditions of the floor drain, and the power outlet in advance; and enter the site to hang the host and test pressure after the tiles are pasted and the cabinet is installed, and completely separate from the ceiling construction of the heating and ventilation, orderly and in order.Actual Construction Reference for 120㎡ Apartment Types in Tianjin
Looking at the delivery projects in Tianjin in recent years, such as Wuqing Nongken Han Zhang Tanghua (public户型 about 89-145㎡), Jinnan Zhongjian Ideal City (public户型 about 89-127㎡), and other residential areas, there are a lot of classic three-bedroom two-bathroom apartments of about 120㎡. According to the actual construction records of Quanji Comfort Home in these residential areas, most of these apartment types have the following two common details that are particularly worth paying attention to in advance:
The outdoor unit position is mostly concentrated in the equipment balcony, and there is a certain distance from the far-end second bedroom, and the scheme design will focus on calculating the cold medium pipeline path, try to go straight, reduce unnecessary bends, and ensure the refrigeration efficiency of the far-end room. The new ventilation main unit is mostly installed in the ceiling space of the kitchen or bathroom, and the air duct is laid straight along the beam, which does not affect the open visual ceiling height of the living room and is convenient for changing the filter at home in the future.(Note: The floor, orientation, and ceiling scheme of each household are different, and the specific equipment configuration list still needs to be determined according to the load calculation table after on-site measurement.)
Common Questions and Answers
Question: For a 120㎡ three-bedroom two-bathroom apartment, should I choose a one-to-four or a whole-house one-to-five central air conditioning unit? Answer: For most 120㎡ three-bedroom two-bathroom apartments, a one-to-four (one for the living room and one for each bedroom) is already very generous. Only when the dining room is completely independent, the area is over 15㎡ and there is a clear partition from the living room, or if you plan to install a dedicated air conditioning unit for the kitchen, do you need to consider a one-to-five. Question: If the budget is tight, can I install central ventilation after moving in? Answer: Pipe-type central ventilation is not recommended to be installed after moving in. Because its air supply pipe and exhaust pipe must be hidden in the ceiling, and holes must be drilled through the beam. Once the ceiling is sealed and the wall is painted, it can only be installed with a wall-mounted new ventilation unit later, and the full-house air exchange effect and wall beauty are not as good as centralized ventilation. When the budget is tight, it is better to keep the concealed pipeline and wiring of air conditioning and ventilation first, and put non-concealed electrical appliances later. Question: If I can only install one or two of air conditioning, ventilation, and water purification, how should I prioritize them? Answer: According to the principle of "the more difficult it is to add non-destructively after decoration, the higher the priority", the recommended order is: central air conditioning > central ventilation > whole-house water purification main unit (pre-filter/central water purification/soft water) > countertop terminal drinking water machine. As long as the pipeline and points are reserved by the designer during the water and electricity stage, the backend equipment can be added in batches according to the rhythm.Good home decoration budget is not a simple subtraction, but to spend money on the places that make you feel "right" ten years later. Before the water and electricity construction, make a systematic load and pipeline planning with the floor plan, and a 120㎡ home can still live in a quiet, cool, and spring-like feeling all year round.
相关知识
天津120㎡三室两厅,空调、新风、净水怎么配?按负荷算出来的配置与三档预算
新风空调是智商税?可以替代新风系统吗?
全屋净水安装指南:前置、中央、软水与厨下设备配置
夏天来了,到底选空调还是新风
好风好水 美好生活·2023新风与净水分会会长工作会议圆满成功
完胜对手还不够?海信宣布新风空调继续全线升级
双十一新风空调怎么选?超一级1.5匹挂机选购指南来了
双11新风之争:THOMOS VS JAKOONIA,选谁?
TCL空调重磅发布2021全新智慧新风空调
农村自建房预算明细表 农村自建房120平要多少钱
网址: 120㎡三室两厅,空调新风净水配置与预算 http://www.jiajubaike.cn/newsview157807.html
推荐即时动态
- 1自建房造价多少钱一平米 2 24995
- 2重磅出击▏欧嘉全屋定制荣获“ 17289
- 3属鼠和属兔的合不合 属鼠的和 16417
- 4大角鹿瓷砖 8438
- 5天天315,品质365!看联 6230
- 6卢森地板2022新品触感系列 6182
- 7骊住水科技第四届进博会访谈实 5710
- 8爱情数字代表的意思大全 恋爱 5696
- 9属鸡男与属鼠女相配吗 属鸡男 5035
- 10世外康养 设计中国度假式居家 4896
